5 Documents Required for an Environmental Audit of a Construction Project

If you are in the construction business, then you will know that an environment audit is one of the first things you need to do before starting your construction work. Construction work needs to use chemicals and products that should be environmentally friendly.

It should be made sure that the neighbouring areas are not affected because of the construction process. Here are all the documents you’ll need to conduct an environmental audit.

Floor plans

This will show the extent of the audit to be conducted. The plan must be up to date and in case work has not been done according to the plan, the floor plan must be revised before doing the audit.

5 Documents Required for an Environmental Audit of a Construction Project floor plan - 5 Documents Required for an Environmental Audit of a Construction Project

Permits

For construction projects, you need to obtain permits for your work from the local authorities. You should get permission for things like air emission or wastewater management.

You should list the chemicals you are going to use and get permission for using them. This document must be ready for an audit.

Inspection reports

The construction site must be regularly inspected, and a report must be written which will indicate the current situation and the progress. This will help to check whether any hazardous products are being used or not which might cause harm to the environment.

Plans

You should provide a detailed plan for your work. You should mention what milestones you expect to achieve and how. You should mention your plan to prevent pollution due to chemicals or wastes. You should write about your emergency action plans as well.

Training

You should have certificates mentioning that the employees have undergone proper training to conduct the work. This includes safety training as well so that the employees know what gear to use, how to handle chemicals and other things.

Environmental audits may take a lot of time. But it must be done as it indicates that your project complies with the environmental laws and regulations. It is better to do this audit at the beginning so that you don’t have to make any major changes on your project later on.